Emirate

License for Major Projects online

How to get the service of License for Major Projects online ?

In this article, we will talk about the service of License for Major Projects online which is provided by Al Ain City Municipality for UAE citizens and business sector.
This service aims to issue a business license progress of major projects such as a processing site license (without drilling) and license digging foundations and support aspects of drilling note that large enterprises are Hotels – malls – development projects – commercial centers – schools – hospitals- commercial buildings – industrial buildings – government projects that exceed two floors. Keep reading this article in order to get more information about this service.

License for Major Projects steps

اعلان

For applying this service, there are some procedures you should follow them to get this service. They are represented by the following steps:

  • Go to the website of this service.
  • Apply the request. Provide the required documents. Pay service fees. Pay Insurance of removal of construction waste.

License for Major Projects Requirements

اعلان

There are some required documents you have to attach them in order to obtain this service, which are :

  • First, you have to attach a copy of formal letter from the government
  • agency or consultant (if any)
  • commissioned by the contracting
  • company to receive license out.
  • Second, it is necessary to attach a copy of valid business license issued by the
  • Emirate of Abu Dhabi to the contractor
  • (allowing decoration companies from
  • outside the Emirate of Abu Dhabi in
  • the event of decorative license application only).
  • Third, it necessary to attach a copy of Contractor signature approved by the court. In this document there is a condition that Engineer Contractor business card or residence or origin factor data from the Ministry of Labour or investor Card (not required for a license decorative and umbrellas license cars outside the boundaries of the coupon).
  • Fourth, you have to attach Investor card (Investor card(request
  • for graduation certificate of the
  • Enginee). Also in this document there is a condition in which Engineer accept card (in case of loan, a civil engineer, architect, engineer assistant).
  • Fifth, a copy of updated Site plan.
  • Sixth, a copy of No-objection certificate from the Department of Health and Safety (EHS).
  • Seventh, a copy of Form AACM-CP-CF-06.
  • Eighth, a copy of Form AACM-CP-CF-15.
  • Nineth, a copy of In the event of a processing site license (without drilling).
  • Tenth, a copy of Site speech delivered from the Gaza cities and Area Planning.
  • Eleventh, a copy of Roads approval.
  • Twelfth, a copy of In the case of a license digging foundations and support aspects of drilling.
  • Thirteenth, wrote detection service lines (telecommunications, electricity,
  • water, sanitation) out.
  • Fourteen, it is necessary to attach Approval of the adoption of Section diagrams on the consolidation method in the case of drilling.
  • Finally, pledged technical assets out of the
  • building.

If you want to contact us, please contact us on call center 800555 or throughout email info@am.ae .

Finally we have come to the end of this topic which talks about how to obtain the service of License for Major Projects online. We presented this article throughout knowright website for publishing electronic services.

السابق
obtain the service of Maps Issuance Online abudhabi.ae
التالي
How to get GCAA E-Service